Sheikh Khalifa Houbara Breeding Centre GYM Swimming Pool

Indoor Swimming Pool, Foot Pool & Shower

Sheikh Khalifa Houbara Breeding Centre GYM Swimming Pool

Swimming pools can be outdoor or indoor. Outdoor swimming pools offer a pleasant experience on sunny days. Indoor swimming pools, on the other hand, provide the opportunity to swim all year round without being affected by weather conditions. Especially businesses with sports facilities and social facilities such as schools, housing estates, hotels, companies definitely want to add at least one pool to their social facility projects. The swimming pool in our social facility project of Kazakistan Houbara Plant is also planned as an indoor swimming pool.

Houbara facility is a special bird species production facility established in Shymkent, Kazakhstan. A part of the social facility built for this facility managers and employees is the SPA area. The pool is planned as a part of the SPA area.

Swimming Pool: Overflow system swimming pool with a dimension of 6.00x12.00 m, a depth of1.40 m, an area of 72 m² and a volume of 100.80 m³.
Footbath: Overflow system footbath with a dimension of 1.75x1.85 m, a depth of 5 cm.
Pool, balance tank, technical room, foot bath and pool shower plaster & screed and insulation installation
2.5x2.5 cm harmony porcelain coating inside of the pool
Porcelain handles around the pool
Porcelain non-slip coating on terrace
2.5x2.5 cm harmony porcelain coating for foot bath and shower
Epoxy-based joint application for all coatings
Swimming pool and foot bath filtration system installation
AFM glass filter element
Pool mechanical - electrical system installation
Swimming pool automatic chemical disinfection control and dosage unit
Foot bath chemical dosing unit
AISI 316 stainless steel pool ladder and pool ladder with stainless steel handle
AISI 316 quality stainless steel framed, daylight color 36W Power LED spotlight for pool wall
8W power led mini lights for stairs
AISI 316 quality stainless steel swimming pool accessories
Pool water heating system (plate heat exchanger)
Pool water heating system automation
Pool shower area mosaic applications

Project Location

Chimkent, Kazakhistan

Project Owner

System Construction

Project Start & Finish Date

2018 - 2019

Duration

4 Months