Kazan Palace Hotel Spa
Spa (Sauna-Hammam-Steam Room-Shower)

The origin of the word SPA comes from Latin. In Latin, “Selus Per Aqua” means “Health from Water”. Today, centers that apply therapy with water are called “SPA” or “Wellness” in short. Indispensable parts of a SPA or Wellness center are massage pool, swimming pool, underwater fitness pool, sauna, steam room, salt room, ice room, massage rooms, fitness, etc. Users relieve the tiredness and stress of the day, relax their bodies and rejuvenate their skin in these facilities.
SPA sections are now indispensable in hotel projects. A large and functional SPA has been included in our Russia Kazan Palace hotel project.
Kazan Palace was built in Kazan, the capital of Tatarstan, a part of the Russian Federation. A 100-year-old hospital located in the city center was transformed into a hotel through renovation. In this hotel, where the old structure is skillfully combined with modern architecture without disrupting the traditional Russian architectural lines, the General SPA and Presidential SPA areas built have modern lines. Both the general SPA area and the Presidential SPA area have an extremely elite and functional structure with their scope, design and material selection.
TEPIDITY
Tepidity with a dimension of 2.20x6.00 m, a height of 3.20m, an area of 13.20 m² and a volume of 42.24 m³ .
Plaster & screed and waterproofing installation
Wall and floor coating with Marmara marble
Hidden led lighting in the wall
Power LED lighting on ceiling
Electrical heating system and automation panel
Wooden hammam door
Polyester (GRP) special vault ceiling manufacturing
Manufacturing of hidden water ducts on the ceiling and wall
Speaker
Ventilation
HAMMAM
Hammam with a dimension of 4.10x10.65 m, a height of 3.20m, an area of 43.70 m² and a volume of 139.70 m³
Plaster & screed and waterproofing instalation
Wall and floor coating with Marmara marble
Kurna made from Marmara marble,
Seating and belly stone made from Marmara marble
Vitra Nest faucet for kurnas
Hidden led lighting in the wall
Power LED lighting on ceiling
Electrical heating system and automation panel
RAL 7021 glass hammam door
Polyester (GRP) special vault ceiling manufacturing
Manufacturing of hidden water ducts on the ceiling and wall
Speaker
Ventilation
SAUNA
Sauna with a dimension of 3.15x4.55 m, a height of 2.40 m, an area of 14.33 m² and a volume of 45.90 m³.
Plaster & screed, insulation installation
Ceramic coating on floor
Ayous / Abachi wood coating for walls and ceiling
Sauna Abachi wood seating group manufacturing
Sauna wall custom design sconce lighting
LED lighting hidden in the wall
Sauna stove and digital control panel
Decorative pyramid stone coating of the back of sauna stove
Sauna stove guard which is made from wood
Installation of emergency button and alarm bell
Speaker
Sauna decorative equipment (thermometer, wooden cushion, bucket and ladle)
RAL 7021 glass sauna door
STEAM ROOM
Steam room with a dimension of 2.55x3.00 m, a height of 3.20 m, an area of 7.65 m² and a volume of 24.48 m³
Plaster & screed, insulation installation
XPS Seating group manufacturing
Heczagon porcelain mosaic coating on the wall
Polyester (GRP) special vault ceiling manufacturing
Manufacturing of ceiling-wall concealed water duct
LED lighting hidden in the wall
Power LED lighting on ceiling
Steam generator and digital control panel
Steam generator water softening system
Manufacturing of hidden water ducts on the ceiling and wall
Speaker
RAL 7021 glass door
Hans Grohe hand shower
Steam outlet with stainless steel direction adjustment
Installation of emergency button and alarm bell
Ventilation
Electro-mechanical installations
SHOWER
Shower with a dimension of 1.20x1.20 m, a height of 3.20 m, an area of 1.44 m² and a volume of 4.60 m³ .
Plaster & screed, insulation installation
Anthracite porcelain tile coating on the floor
Spot lighting on the ceiling
Vitra Nest series rain shower
Wooden Bucket for shock shower
Other mechanical installations
Wooden teak grating coating on the ground
Project Location
Tataristan, Russia
Project Owner
Polistroy Kapital
Project Start & Finish Date
16.03.2018 - 03.09.2018
Duration
167 Days



























