Embassy Of Saudi Arabia Pools

Indoor Swimming Pool & Fountain

Embassy Of Saudi Arabia Pools

Swimming pools can be outdoor or indoor. Outdoor swimming pools offer a pleasant experience on sunny days. Indoor swimming pools, on the other hand, provide the opportunity to swim all year round without being affected by weather conditions. Especially businesses with sports facilities and social facilities such as schools, housing estates, hotels, companies definitely want to add at least one pool to their social facility projects. The swimming pool in our social facility project of the Saudi Arabian Embassy is also planned as an indoor swimming pool.

The pool is planned as a part of the SPA area. The patterned mosaics on the pool floor carry influences from Saudi Arabian culture. In addition, 2 single fountain pools in the embassy building garden have been designed and manufactured.

EMBASSY OF SAUDI ARABIA SWIMMING POOL
Overflow system swimming pool with a dimension of 4.35x8.00 m, a double depth of 1.30 m - 1.90 m, an area of 35 m² and a water volume of 56 m³.
Pool filtration system installation
AFM glass filter media
Pool mechanical - electrical system ninstallation
Pool automatic chemical disinfection and dosing unit
Pool ozone disinfection system
AISI 316 quality stainless steel pool ladder
36W Power LED spot pool lighting
Pool water heating system (plate heat exchanger)
Pool water heating system automation
Supply and installation of 9.5 m³ capacity stainless steel modular tank

EMBASSY OF SAUDI ARABIA WATER FOUNTAIN
Water fountain with a diameter of R: 2.00 m, a depth of 0.35 m, 2 pcs
Water fountain with a diameter of R: 5.00 m, a depth of 0.35 m, 1 pcs
Tekno cascade fountain located at the middle of the fountain
Stainless steel sprinkler submersible pump located in pump pit
Stainless steel grill cover for pump housing
Power LED fountain lights
Led Line pool wall lights
LEDline lighting following the pool wall

Project Location

Ashgabat, Turkmenistan

Project Owner

Alazhari Contracting

Project Start & Finish Date

30.04.2017 - 15.08.2017

Duration

105 Days