Biological Swimming Pool
Biological Swimming Pool & Instrument Fountain Construction

Biological swimming pools are designed to allow swimming in pure, clean and clear water that does not contain any chemicals. These pools, which benefit from the natural filtering properties of the natural clay to be placed in the swimming pool and the aquatic plants planted in this clay, eliminate harmful organic substances and microbes in the water with the natural bacteria added to the water, aquatic plants and special clay layers to which the aquatic plants cling. Therefore, there is no need to use chlorine in biological swimming pools. If necessary, biological disinfection can be supported with non-chemical ray and ozone systems. Thus, you can swim in clear and clean water without smelling and tasting chlorine. Thanks to the special Bio pool infrastructure we have implemented, classic pools that threaten human health and require high maintenance costs are being replaced by biological pools. An open biological swimming pool was also included in our Muğla, Bodrum project.
This biological pool built in the garden of a farmhouse in Bodrum was very suitable for the farm with its wooden scaffolding and stairs. We have provided a natural swimming pool to this farm located in nature with various aquatic plants. The saxophone fountains placed in the shallow area with water plants inside the pool create a rainy atmosphere where you can watch the rainbow all the time on sunny days.
Biological swimming pool 200 m² area and 300 m³ water volume
Biological swimming pool regeneration system
Biological swimming pool regeneration area
Bio culture
Biological swimming pool water plants
Biological swimming pool bio filtration system
Fully automatic filter control system
Water UV disinfection system
Chemical stabilization units
Anti-phosphate units
Aerators
316 stainless steel accessories inside the pool (feding nozzles, grates,..ect)
316 Stainless steel Power LED mini and maxi spot wall lighting
Wooden pool ladder
POOL INSTRUMENT FOUNTAIN
Production of 2 trumpet fountains
Brass trumpet fountain application and restoration
Trumpet fountain water circulation system
Fountain filtration system
Project Location
Muğla, Türkiye
Project Owner
Erci Tarım
Project Start & Finish Date
10.03.2022 - 19.06.2022
Duration
99 Days