top of page

Awaza Rehabilitation Center Therapy & Thermal Pool

Therapy & Thermal Pool

Awaza Rehabilitation Center Therapy & Thermal Pool

In hotel projects, a SPA consisting of at least one outdoor or indoor pool, sauna, steam room or Turkish bath is now a must for hotel projects. In our Rehabilitation Center project called “Awaza Hospital” built in Awaza city of Turkmenistan, thermal baths, indoor thermal pools and indoor hydrotherapy pool were included in the project.

“Awaza Hospital” located on the shores of the Caspian Sea was built on a thermal water source. As its name suggests, it is a rehabilitation center. The thermal water here is around 20oC in summer and winter. Therefore, it is a thermal spring water in the “cold thermal” group. This center has rooms with thermal water, thermal pools, a massage hydrotherapy pool for the disabled and a natural seawater pool. In addition, additional special disinfection systems were installed for the thermal pools. Powerful massage systems were considered in the hydrotherapy pool. Special seating groups and grab bars were considered for the disabled in all pools.

Overflow system theraphy swimming pool with a dimension of 7.75x22.80 m, a depth of 1.40 m, an area of 177 m² and a volume of 247.00 m³.
DIN norm slow filtration system installation
AFM glass filter media
Pool filtration mechanical - electrical system installation
Pool massage system (back-calf air and water massage, foot air massage)
Massage system poolside automatic control units
In-room massage units mechanical - electrical system installation
Fully automatic, touch screen controlled, filtration system installation
Fully automatic, touch screen controlled, technical equipment monitoring system
Fully automatic, touch screen controlled, massage equipment monitoring system
Pool automatic chemical disinfection and dosing system
Ozone disinfection system
Pool water heating system (plate heat exchanger)
Pool water heating system automation
AISI 316 quality stainless pool ladder, stainless stair handle
AISI 316 quality stainless steel retention bar
AISI 36 W Power LED Spot Lighting for Pool Walls
8 W Power LED mini spot lighting for pool stairs

AWAZA REHABILITATION CENTER THERMAL POOL
Overflow system thermal swimming pool with a dimension of 4.00x6.90 m, a depth of 1.20 m, an area of 27.60 m² and a volume of 33.12 m³.
Sand-sludge separator, pre-filtration and automation system for fresh thermal water
Fully automatic, touch screen controlled, technical equipment monitoring system installation
UV disinfection systems
AISI 316 quality stainless stair handle
AISI 316 quality stainless steel retention bar
36 W Power LED Spot Llghts for pool walls
Technical room water level warning system

Project Location

Awaza, Turkmenistan

Project Owner

Polimeks Construction

Project Start & Finish Date

2017 - 2018

Duration

'-

bottom of page